Cement silo is not easy to maintain

Go down

Cement silo is not easy to maintain Empty Cement silo is not easy to maintain

Post  dwdaswell Tue Jan 07, 2014 8:17 pm

1.When the Cement warehouse (cement silo) work concrete mixer for sale,The special crane must be the stand, And then on the basis of concrete prefabricated good in advance and check the Cement warehouse (cement silo) erected after the vertical with the horizontal, and then the bottom and the basis of pre-embedded parts firm.

Henan Daswell Machinery Co., Ltd,is a professional manufacturer and trader specializing in the research, development and production of construction machinery for nearly 30 years. Our main products are as follows:batching plant,block making machine,We will provide you with the best product and service.

2.After fixed.By bulk cement car shipping cement to the construction site, and then Connect transfer pipe line of cement truck With Cement warehouse the feed of the pipeline. Through Bulk cement car of gas pressure taking Tank conveyed to the cement warehouse in cement

3.In the process of conveying the cement storage silos, the operator continuous button pressing the precipitator vibration motor, and shake off the cement attached to the Filter bag. prevent blocked bag, and Blasting warehouse

4.Once blocked the bag, The pressure in the storehouse more than safety pressure of Warehouse top pressure relief valve . the pressure safety relief valve can open release the pressure in the warehouse, prevent explosion warehouse accidents. 

5.Warehouse full and starving can be observed Through the high and low material place

6.When the discharge is required, first open the cone at the bottom of the manual discharge valve concrete pump machine, and then through the cement delivery device (screw conveyor) cement transfer out. In the process of discharge, if there is "bagging" phenomenon, timely press the button of the arch breaker solenoid valve, blow and eliminate the "bagging" the feed, to ensure smooth supply of cement.

7.When the failure of the cement delivery device (screw conveyor), first turn off the cone at the bottom of the manual discharge valve to prevent the cement spill, resulting in waste.

dwdaswell