Fresh connection gaming
Would you like to react to this message? Create an account in a few clicks or log in to continue.

Why to Control the Humidity of Diesel Concrete Mixer

Go down

Why to Control the Humidity of Diesel Concrete Mixer Empty Why to Control the Humidity of Diesel Concrete Mixer

Post  dwdaswell Sun Mar 23, 2014 3:49 pm

<p>1. Before construction, according to the insulation, strength, density and other requirements for foam concrete, design the appropriate mix of construction as well as the thickness of the insulating layer of foam concrete.</p>Henan Daswell Machinery Co., Ltd,is a professional manufacturer and trader specializing in the research, development and production of construction machinery for nearly 30 years. Our main products are as follows:<a href="http://www.dwconstructionmachine.com/">concrete pump</a>ing,<a href="http://www.doubleshaftconcretemixer.com/">concrete mixer</a>s for sale,We will provide you with the best product and service. <p> <p>2. Must do flexible or rigid foam concrete waterproofing before construction, roofing insulation Exalted and non- structural.</p> <p>3. According to the design thickness of the insulation layer, with cement mortar hit the spot, good slope, slope should be about 2% <a href="http://www.dwdieselmixer.com/pro/p14.html">portable concrete mixer</a>, the grass-roots clean .</p> <p>4. Laying ะค2 @ 150 &times; 150 crack iron mesh, for reasons of economy, bamboo can be used instead.</p> <p>5. in the foam concrete mixer</p> <p>The crystal at a stirrer, at a certain mixing ratio, adding water (1.6 ~ 10kg) and foaming agent (0.1 ~ 0 .6 kg) was stirred rapidly for about 3 minutes, making it stand bubble crystal.</p> <p>6. Crystal bubble while stirring, at a certain mix the water (24 ~ 150kg) injected into the following concrete mixer, then added to the cement (48 ~ 300kg, more than 425 labels) and the amount of fine sand (available Fly), bulking agents , additives , slow stir for about 2 minutes.</p> <p>7. The foam crystal, a stirrer was added and stirring was continued in the following homogeneous mixture of cement, about 2 minutes after the stand.</p> <p>8. The stand of foam concrete transported to the construction of the required base surface smooth by pointing with a ruler.</p> <p>9. The Nature Conservancy began after construction being completed, and about 24 hours sprinkler maintenance concrete mixer, to be delivered in about two weeks.</p> <p>10. For the laying of floor tiles, while the foam concrete in construction can be exalted.</p>

dwdaswell

Posts : 2278
Join date : 2014-01-07

Back to top Go down

Back to top

- Similar topics

 
Permissions in this forum:
You cannot reply to topics in this forum