2. Test chamber prohibit spitting, smoking, eating, did not allow the detection-related activities, shall not be stacked and detection unrelated items.

Henan Daswell Machinery Co., Ltd,is a professional manufacturer and trader specializing in the research, development and production of construction machinery for nearly 30 years. Our main products are as follows:portable batching plant,concrete batching plants,concrete mixer,blocking making machine,concrete pump,etc.

3. Non-inspection staff shall wander in and out without the consent of the test chamber. There are temperature and humidity control requirements, testing personnel should also be avoided and out, so as not to affect the control of environmental conditions.
2. Test chamber prohibit spitting, smoking, eating, did not allow the detection-related activities, shall not be stacked and detection unrelated items.

Henan Daswell Machinery Co., Ltd,is a professional manufacturer and trader specializing in the research, development and production of construction machinery for nearly 30 years. Our main products are as follows:portable batching plant,concrete batching plants,concrete mixer,blocking making machine,concrete pump,etc.

3. Non-inspection staff shall wander in and out without the consent of the test chamber. There are temperature and humidity control requirements, testing personnel should also be avoided and out, so as not to affect the control of environmental conditions.

4. Establishment of health duty system, every day someone cleaning, thorough cleaning once a week.

5. Good holiday staff on duty arrangements to ensure curing room in the normal control, to ensure that the necessary testing work normally.

6. Parts to keep equipment, cables, commonly used tools should be arranged in neat rows.

7. The establishment of non-conforming product tests ledger Ready-Mixed Concrete Making Plant, fail to meet the project should be promptly reported to the competent leadership.

4. Establishment of health duty system, every day someone cleaning, thorough cleaning once a week.

5. Good holiday staff on duty arrangements to ensure curing room in the normal control, to ensure that the necessary testing work normally.

6. Parts to keep equipment, cables, commonly used tools should be arranged in neat rows.

7. The establishment of non-conforming product tests ledger Ready-Mixed Concrete Making Plant, fail to meet the project should be promptly reported to the competent leadership.