Fresh connection gaming
Would you like to react to this message? Create an account in a few clicks or log in to continue.

The Prospects of Mini Concrete Mixing Plant

Go down

The Prospects of Mini Concrete Mixing Plant Empty The Prospects of Mini Concrete Mixing Plant

Post  dwdaswell Wed Oct 07, 2015 4:10 pm

The load detection of mini impact crusher is a very important part. The detection of the crusher market is mainly detecting the testing technology of the actual amount of ores through the crusher cavity. The load of the crusher affects the particle size and energy consumption as well as the normal operation of the crusher. So it should be timely detected. In the multi-stage crushing ready mixed concrete batching plant, we generally only test the load of the last paragraph which controls the size of final product. This stage of crusher is usually in a closed system. Its materials amount generally includes the cycle load which is from the former crushing segment. The following are the main methods to test the load of last paragraph of crusher.

Henan Daswell Machinery Co., Ltd,is a professional manufacturer and trader specializing in the research, development and production of construction machinery for nearly 30 years. Our main products are as follows:portable batch plants,concrete batching plants,concrete mixer,blocking making machine,concrete pump,etc.

1. Directly using the contact material level to indicate the material level of the crusher cavity, namely knowing its load.

2. Detecting the current value in the motor circuit of the crusher.

3. Using the belt scales to weigh the conveying capacity of the belt conveyor.

4. Deriving by calculating the cycle load of the crushing and screening closed-circuit system.

dwdaswell

Posts : 2278
Join date : 2014-01-07

Back to top Go down

Back to top

- Similar topics

 
Permissions in this forum:
You cannot reply to topics in this forum