Fresh connection gaming
Would you like to react to this message? Create an account in a few clicks or log in to continue.

The Coordinated Process Service of Daswell Concrete Mixer

Go down

The Coordinated Process Service of Daswell Concrete Mixer Empty The Coordinated Process Service of Daswell Concrete Mixer

Post  hahei Fri Feb 03, 2017 3:12 pm

The high buildings and large mansions of the city stand in great numbers, and the application of concrete mixer is ubiquitous. In the use procedure, the concrete mixer will inevitably break down, so today, Daswell Machinery will detailedly expatiate on the matters that you need to pay attention to in the use procedure of concrete mixer.

Henan Daswell Machinery is a professional manufacturer of construction machine for almost 30 years in China. We are dedicated to supplying our customers with best service and products, our major products include:twin shaft concrete mixer manufacture,diesel mixer for sale,If you are interested in our products, please contact us freely: sales@daswell.com

1. The concrete mixer should be installed in flat, and the concrete mixer should be installed placidly and firmly, so as to avoid failure.

2. Before you operate the concrete mixer, you should check whether the insulation and ground connection of the electrical equipment is good concrete planetary mixer, and whether the protection device of belt pulley is complete.

Concrete Mixer

3. Commissioning should be taken before you feed the materials, and you should feed the materials after the concrete mixer is working normally. If the concrete mixer suddenly stops mixing, then the materials should be discharged. And if you restart the concrete mixer cement mixing plant, there should be no materials in the hopper.

hahei

Posts : 922
Join date : 2014-02-08

Back to top Go down

Back to top

- Similar topics

 
Permissions in this forum:
You cannot reply to topics in this forum