Fresh connection gaming
Would you like to react to this message? Create an account in a few clicks or log in to continue.

Factors of Concrete Mixing in Producing Concrete

Go down

Factors of Concrete Mixing in Producing Concrete Empty Factors of Concrete Mixing in Producing Concrete

Post  dwdaswell Sun Apr 13, 2014 3:56 pm

<p>a commercial concrete mixing station with 1-2 pool, must be able to guarantee the required concrete mixing and mechanical cleaning.</p>Henan Daswell Machinery Co., Ltd,is a professional manufacturer and trader specializing in the research, development and production of construction machinery for nearly 30 years. Our main products are as follows:<a href="http://www.daswellchina.com/">concrete <a href="http://www.daswellchina.com/products/concrete-batchingplants/ready-mixed-concrete-mixing-plant.html/">batching plant</a></a>,<a href="http://www.daswellchina.com/products/othermachine/concrete-pump.html/">concrete pump</a>ing,We will provide you with the best product and service. <p> <p>3, a production line with at least two compatible cement silo, preferably three, take turns using replenish, to meet the needs of production without making concrete cement backlog.</p> <p>4, a blender and feed ingredients related to a production line system. General engineering can only set a production line, large and important projects should be set up two production lines <a href="http://www.daswellchina.com/products/concrete-mixing-plant/hzs60-ready-mix-concrete-plant.html/">batch plant</a>, arranged side by side, in order to ensure uninterrupted supply of concrete for the project; a project can only set a mixing station, each partition can also be set mixing station, or Grouped together with a large amount of concrete mixing station transport vehicles; specific to the facts of the case.</p> <p>5, large volume and pumping concrete with fly ash and admixtures generally required, according to the scene were placed for ease of use is appropriate.</p> <p>6, gravel piled partition, to prevent mixing of concrete caused by grading allowed; equipped loaders feed and gravel were neatly stacked; sand, stone yard area should be large enough to meet the required engineering consuming, and can be easily organizations feed supplement; venue to harden for easy loading trucks loading and prevents dirt and other debris into the material inside.</p> <p>7 concrete batching plant, concrete batching plants and feed ingredients host system should be based on the project schedule, concrete total daily dosage of concrete indicators configurations to meet the maximum daily dosage is appropriate concrete.</p>

dwdaswell

Posts : 2278
Join date : 2014-01-07

Back to top Go down

Back to top


 
Permissions in this forum:
You cannot reply to topics in this forum