In the late 1980s, the emergence of new models of domestic crusher , crushing limestone, quartz sand, the material will be used when the mine to the crusher , in order to enable users to better use crusher equipment , Fote explained Impact crusher in some major preparatory work before the test machine .

First, the impact crusher cleaned and cleaned up the scene, the machine near objects move away , and all the tools neatly placed in a fixed location .

Second, start the motor and equipment , power distribution switchgear should be individually adjusted the direction of rotation of the motor shall meet the requirements of the crusher.

Third , check the cylinder body , crosshead , connecting rods, cylinder heads and anchor bolts and other fastening , if undesirable place should be adjusted and repaired immediately.

Fourth, measured once again a gap of two dead cylinders , check the test results are consistent with the provisions of such discrepancies will have to re-adjust .

Fifth, the broken oil tanks ( oil bath body should be wiped clean ) injection prescribed brands of lubricants, oils or oil standard ruler to check the oil level , to meet the requirements . Hand shake gear pump , oil injected into the moving parts , and make more oil to reach Ol MPa , while observing the situation of each lubricant injected into the oil at the point of moving parts lubricated .

Sixth, adding provisions to the oiler grade compressor oil, then on each cylinder at the joint closest pipe breaking . Crusher oiler shake hands until the oil drip out so far from the tube and check the tubing in contact with the cylinder installed at the check whether the width is sensitive . Then connect the tubing , and then hand shake oiler , to a , two -cylinder injection oil lubrication points .

Seventh, open the pump , open the valve cooling pipes , cooling water flow unimpeded , and check whether the connection fittings at the water leakage . Check the valve opening and closing the exhaust pipe is flexible .

Eighth, check the pressure gauge, thermometer , and the adequacy of various protective devices . Remove the cylinder valve on all levels , the cover lid and tighten the bolts, the unloader valve is adjusted to the start position .

Ninth , turning the car crusher plate 2-3 forward, check and sports organizations without blocking and collision situation .

Henan Fote Heavy Machinery Co., Ltd is a joint-stock mining machinery manufacturing enterprise integrated in scientific research, production and marketing of portable aggregate crusher, sand crusher and other commonly used mining equipment, welcome to visit and cooperate with us. Thank you!
combination stone crusher: http://www.chinafote.com/pro/p9.html