Fresh connection gaming
Would you like to react to this message? Create an account in a few clicks or log in to continue.

All the inspection items should be finished well

Go down

All the inspection items should be finished well Empty All the inspection items should be finished well

Post  dwdaswell Thu Jul 03, 2014 2:23 pm

<p>After completing above inspection items <a href="http://www.dwmixers.com/products/concrete-batching-plant/portable-concrete-batching-plant.html">batching plant</a>, you can make a trial run. Start up and wait until the motor run normally, pull the total clutch. First run the empty machine for 2-3 minutes <a href="http://www.daswellchina.com/products/concrete-mixers/diesel-concrete-mixer.html">cement mixer</a>s, and observe if the stirring drum rotates normally.</p>Henan Daswell Machinery Co., Ltd,is a professional manufacturer and trader specializing in the research, development and production of construction machinery for nearly 30 years. Our main products are as follows:<a href="http://www.daswellmixer.com/product/Concrete_Batching_Plant/20130929/21.html">concrete mixing plant</a>,diesel engine <a href="http://www.dwdieselmixer.com/">concrete mixer</a>,We will provide you with the best product and service. <p> <p>To view the reducer and the smooth ill is enough or not.To check the electrical wirings of motor and components of motor and ensure the connection is firm, and it is necessary for the distribution box shell to connect with the grounding solidly.</p> <p>Multiple Discharge Choice. According to customers' various demands, the discharging gate can be designed to open hydraulically, pneumatically or manually.</p>

dwdaswell

Posts : 2278
Join date : 2014-01-07

Back to top Go down

Back to top

- Similar topics

 
Permissions in this forum:
You cannot reply to topics in this forum