Fresh connection gaming
Would you like to react to this message? Create an account in a few clicks or log in to continue.

How to control dust pollution in the concrete mixing plant

Go down

How to control dust pollution in the concrete mixing plant Empty How to control dust pollution in the concrete mixing plant

Post  dwdaswell Tue Jul 29, 2014 3:24 pm

<p>The hopper should be elevated to the top dead center for maintenance and overhaul. Locked with a peace pin on the track. Mixing station to run the first week of the lifting mechanism should be checked daily limit connection bolts loose. Before each formal operation, should enhance the bucket manually lifting and landing, in order to determine whether the limit switch flexible and reliable. The second limit switch should be checked once a day is flexible and reliable, checked weekly limit limit switch reliability.</p>Henan Daswell Machinery Co., Ltd,is a professional manufacturer and trader specializing in the research, development and production of construction machinery for nearly 30 years. Our main products are as follows:<a href="http://www.dwconstructionmachine.com/en/Products/Concrete_Batching_Plant/25.html">Modular type mobile mixing plant</a>,mobile concrete <a href="http://www.dwmixers.com/products/concrete-batching-plant/mobile-concrete-batching-plant.html">batch plant</a>,We will provide you with the best product and service. <p> <p>4 stroke switch maintenance</p> <p>When wire rope every pitch wire breaking number of more than 5% of the total root root should always check the wire rope a chuck fixed and wear situations. Should be replaced.</p> <p>3 rope maintenance</p> <p>Used for the first time or after the maintenance of the power system should check whether the transport direction of the conveyor belt. The conveyor belt can not be used due to wear and rare tape machine must load starting. Failure for most of the deviation breakdown damage caused by human factors, should therefore check whether the various moving parts in normal operation, the conveyor belt or without deviation mobile <a href="http://www.dwdieselmixer.com/">concrete mixer</a> <a href="http://www.doubleshaftconcretemixer.com/mpmixers/mp1500-planetary-concrete-mixer.html">portable <a href="http://www.daswellmixer.com/product/Concrete%20_Mixer/20130929/24.html">cement mixer</a>s</a>, without foreign body between the conveyor belt and the driven roller. There are exceptional circumstances, failure in the power supply should be immediately ruled out. Tension roller at a the hammer box of institutions belt running side occurs along the deviation in the sandbox opposite direction to add weight to adjust.</p> <p>2 Belt Conveyor</p> <p>Wear liner wear and pressure plate bolts should be checked monthly, based on the use of the mixing station. And replace damaged liner and bolt. The first week of the mixing station, should be checked daily for all the sensors on the set silo bearing nut locking, later changed to a weekly check.</p> <p>Aggregate set silo</p> <p>1. Aggregate batching system</p>

dwdaswell

Posts : 2278
Join date : 2014-01-07

Back to top Go down

Back to top


 
Permissions in this forum:
You cannot reply to topics in this forum