Fresh connection gaming
Would you like to react to this message? Create an account in a few clicks or log in to continue.

The Balance of Raw Material Is Important for Concrete Pump

Go down

The Balance of Raw Material Is Important for Concrete Pump Empty The Balance of Raw Material Is Important for Concrete Pump

Post  dwdaswell Thu Dec 11, 2014 4:04 pm

<p>4, do not stop the compressor before decompression, otherwise, powder materials may back into the cylinder, causing serious damage to the compressor.</p>Henan Daswell Machinery Co., Ltd,is a professional manufacturer and trader specializing in the research, development and production of construction machinery for nearly 30 years. Our main products are as follows:<a href="http://www.blockmakingmachinery.org/products/DMBE-2-45-Mobile-Block-Making-Machine.html">concrete block making machine</a> supplier,<a href="http://www.daswellchina.com/products/concrete-batchingplants/small-concrete-batching-plant.html">concrete batching plant</a>s,concrete mixer,blocking making machine,concrete pump,etc. <p> <p>5, to be checked before starting the oil standard. Oil level not lower than the oil standard limit ; must always check whether the oil pump <a href="http://www.beton-mixer.com/products/concrete-mixer/diesel-concrete-mixers.html">sicoma twin shaft mixer</a>, if oil should immediately stop inspection, otherwise starvation would seriously damage the compressor.</p> <p>6, to schedule replacement of oil. New machine for 30 hours after discharge crankcase oil, clean the house and crankcase oil network, then oil. According to a year after the oil change once.</p> <p>7, to inspect, clean filter screen. Normally quarterly inspection, cleaning time, if the machine is heavily used, you should check a month, clean again.</p> <p>8, the machine used lubricants CD40 diesel oil. Prohibit mix different grades of lubricating oil, or oil deterioration will affect the lubricating effect. 9, each working 30 hours to maintenance, cleaning the air filter. While rotating the filter, a pressure less than 0.6MPa compressed air blown from the inside out. After five maintenance, replace the filter. Non- oil or water cleaning concrete pump equipment filter.</p>

dwdaswell

Posts : 2278
Join date : 2014-01-07

Back to top Go down

Back to top

- Similar topics

 
Permissions in this forum:
You cannot reply to topics in this forum