Four Factors Should be Noticed Before Install Concrete Batching Plant

Go down

Four Factors Should be Noticed Before Install Concrete Batching Plant Empty Four Factors Should be Noticed Before Install Concrete Batching Plant

Post  hanxue Tue Apr 21, 2015 4:01 pm

Horizontal concrete batching plant? project is divided into concrete mixing plant and commercial concrete mixing stations, different types of mixing station, has a different layout. Engineering is usually small and medium sized mixing station equipment, merchandise and medium-sized manufacturers mix mixing station is mixing station equipment. The following describes the layout of the concrete mixing station when to pay attention to several aspects:

Henan Daswell Machinery Co., Ltd,is a professional manufacturer and trader specializing in the research, development and production of construction machinery for nearly 30 years. Our main products are as follows:concrete mixer manufacturer,SICOMA Planetary Concrete Mixer,concrete mixing and batching plant,etc. We will provide you with the best product and service.

(1) Industrial raw materials. commercial concrete batching plant works is to put each finished industrial raw materials for further processing, the finished material is mainly gravel, sand and cement, according to the gravel: sand: cement = 20-30%: 50-60%: 10-20% ratio ratio. The main components of the concrete products is gravel and sand, so the layout of the mixing station, local station must be considered from the sand, gravel and other places near.

(2) The area of transport. Concrete plant to be close to highways, railways, waterways, so as to facilitate transport, and remote transportation costs concrete products. Concrete product throughput and volume was relatively large, aggregate into the plant is cement batching plant, the transportation factors concrete batching plant, but also to consider a top priority.

(3) Safety and environmental protection. To facilitate the mixing station layout workers to use, safe operation. Also in line with the state environmental requirements, stirring standing because the production process will produce a lot of dust and noise, so try to avoid the downtown station.

(4)Consumption of finished concrete. Because the characteristics of the concrete can not be stored, so it should be watered as soon as possible. Such asconcrete batching plant abroad to pitch consumption centers generally not more than 30km, transport time must be controlled before the initial setting of concrete, and therefore the transport distance clearly identified.