1, prior to the use of the new machines should be applied in accordance with the concrete mixer specification begged for various systems and components to be inspected on a case-by-case basis and the necessary test mission. Empty the mission to check the mixing tube or mixing blade change direction and operation of mission equipment, brake, confessed to normal before operating.
Henan Daswell Machinery is a professional manufacturer of mining machine for almost 30 years in China. We are dedicated to supplying our customers with best service and products, our major products include:concrete block making machine,portable diesel concrete mixer,If you are interested in our products, please contact us freely: sales@daswell.com
2, fixed concrete mixer, should be installed in a robust pedestal. Long effort to use anchor bolts should be embedded; such as short-term use, laying sleepers and find lie flat and stable base.
3,Mobile concrete mixer should be installed in the flat consolidation Pingshang with square wooden bracket frame firmly adhere to the horizontal plane tires not force. If use of the work beyond the more than three months SICOMA Twin Shaft Compulsory Mixers, you should tire Remove the axle end safekeeping should do the clean the antirust mission.
4, some of the needs to dig located on the the hopper pit mixer, the its the Hang Hau around should be boosted compacted, to prevent surface water flows into the pit. On track the bottom of the frame bearing surface of the material should be compacted or paving, behind the frame should also be supported with wood SICOMA Planetary Concrete Mixer Twin Shaft Concrete Mixer, to prevent the mission when the orbit deformation.
Henan Daswell Machinery is a professional manufacturer of mining machine for almost 30 years in China. We are dedicated to supplying our customers with best service and products, our major products include:concrete block making machine,portable diesel concrete mixer,If you are interested in our products, please contact us freely: sales@daswell.com
2, fixed concrete mixer, should be installed in a robust pedestal. Long effort to use anchor bolts should be embedded; such as short-term use, laying sleepers and find lie flat and stable base.
3,Mobile concrete mixer should be installed in the flat consolidation Pingshang with square wooden bracket frame firmly adhere to the horizontal plane tires not force. If use of the work beyond the more than three months SICOMA Twin Shaft Compulsory Mixers, you should tire Remove the axle end safekeeping should do the clean the antirust mission.
4, some of the needs to dig located on the the hopper pit mixer, the its the Hang Hau around should be boosted compacted, to prevent surface water flows into the pit. On track the bottom of the frame bearing surface of the material should be compacted or paving, behind the frame should also be supported with wood SICOMA Planetary Concrete Mixer Twin Shaft Concrete Mixer, to prevent the mission when the orbit deformation.
hahei- Posts : 922
Join date : 2014-02-08
Similar topics
» Considerations for concrete mixing plant production in hot summer
» Production Characteristics of Concrete Mixer
» Portable concrete mixer Has Production Stability
» Green Production Way of small concrete mixer
» The Maintenance of Mobile Concrete Mixer in Production
» Production Characteristics of Concrete Mixer
» Portable concrete mixer Has Production Stability
» Green Production Way of small concrete mixer
» The Maintenance of Mobile Concrete Mixer in Production
Page 1 of 1
Permissions in this forum:
You cannot reply to topics in this forum