Fresh connection gaming
Would you like to react to this message? Create an account in a few clicks or log in to continue.

The research of Daswell concrete mixing plant

Go down

The research of Daswell concrete mixing plant Empty The research of Daswell concrete mixing plant

Post  dwdaswell Mon Feb 24, 2014 8:47 pm

Shift change when the need to do these things: each class to deal with the oil-water distinction oil and water emissions and air reservoir, introspection lubricator possibility of normal fuel injection. Reflect on each gear box oil spills, whether any abnormal sound. Introspection the brake acts Could active reliable. Cleaning various parts of the slurry mixing station concrete mixer, fouling. Timely cleaning dust stirred tank and the whole surface of the concrete and oil buildup, to prevent the concrete dry and keep it clean.

Henan Daswell Machinery Co., Ltd,is a professional manufacturer and trader specializing in the research, development and production of construction machinery for nearly 30 years. Our main products are as follows:self loading mobile concrete mixer,portable concrete mixer,We will provide you with the best product and service.

Regular checks of the aggregate hoisting rope wear, and updated as necessary. Check arc, hopper reciprocating drive mechanism is flexible, aggregate lifting mechanism is not normal, fastening parts with or without loosening. Check the mixer blade, liner is loose, and regularly adjust the gap between the blade and the liner, and the gap is 6 mm. And subject to wear appropriate replacement.

Explain classes required in all operating the personnel task booth counterpart account of both sides to be careful to do; surrender production obligations and concrete quality; cross equipment operating conditions and precautions; documented ability to accurately perfect to check the operation; ability to check random things. Explain carefully fill operation records. Explain in class processes, identify problems and to find out why, assist in the disposal a serious problem to the competent reporting. Produced after shutdown before real-time thorough cleaning concrete mixer residual, stop all operation will switch to the open circuit position and closed each power switch.

Concrete batching plant maintenance and overhaul homework necessary equipment aborted automatically turn maintenance required power, gas line, hanging avoid closing the warning signs, and secure. Maintenance equipment and other lubricants should be placed in the specified location, waste oils cotton yarn should be stored centrally scheduled processor, are not allowed to throw chaos spilled.

dwdaswell

Posts : 2278
Join date : 2014-01-07

Back to top Go down

Back to top

- Similar topics

 
Permissions in this forum:
You cannot reply to topics in this forum