Fresh connection gaming
Would you like to react to this message? Create an account in a few clicks or log in to continue.

The Pursuit of Daswell Concrete Mixing Plant

Go down

The Pursuit of Daswell Concrete Mixing Plant Empty The Pursuit of Daswell Concrete Mixing Plant

Post  dwdaswell Sun Dec 13, 2015 7:36 pm

1. The gears of concrete mixer gearbox and bearings use the turning of the gears splashing engine oil on the inner wall and then the oil flows into the bearings to lubricate the machine. The oil level of gearbox should be maintained between two engraved lines appropriately. Too high or too low oil level will lead ministries’ temperature rising or poor lubrication, increase power loss and bad machine work. The first 150 hours and 300 hours when a new machine is used, users should exchange engine oil one time to pour out the waste produced in testing the machine. During working mobile brick making machine, users should always check the oil level and fill it in time.

Henan Daswell Machinery Co., Ltd,is a professional manufacturer and trader specializing in the research, development and production of construction machinery for nearly 30 years. Our main products are as follows:small mobile brick making machine,concrete batching plants,concrete mixer,blocking making machine,concrete pump,etc.

2. All exposed parts’ position and rotation need to be adjusted and they should have oil all the time. However, the brakes should not be defiled with oil stain and water, so as not to affect brake function.

3. The lubrication of concrete mixer motor should be done following the instructions.

dwdaswell

Posts : 2278
Join date : 2014-01-07

Back to top Go down

Back to top

- Similar topics

 
Permissions in this forum:
You cannot reply to topics in this forum