Fresh connection gaming
Would you like to react to this message? Create an account in a few clicks or log in to continue.

First Level Care and Maintenance of Compulsory Concrete mixer

Go down

First Level Care and Maintenance of Compulsory Concrete mixer Empty First Level Care and Maintenance of Compulsory Concrete mixer

Post  hahei Wed Apr 13, 2016 3:15 pm

The first level care and maintenance of concrete mixer is usually taken 100h later after work completion.

Henan Daswell Machinery is a professional manufacturer of mining machine for almost 30 years in China. We are dedicated to supplying our customers with best service and products, our major products include:small mobile brick making machine,Portable concrete mixer machine,If you are interested in our products, please contact us freely: sales@daswell.com

1. Except for the ordinary maintenance content, the first class care and maintenance of concrete mixer also includes overhauling the clutch, checking and adjusting the brake clearance. If the inner and outer brake bands of clutch are abraded worst, replacement is required. In addition, it is necessary to check the steel wire rope, V belt sliding bearing, water distribution systems, running wheel, etc.



2. In the first class care and maintenance of compulsory concrete mixer, the gap between stirring blade and liner board should be checked and adjusted mobile concrete mixing plant price, as well as the obturation and flexibility conditions of feeding hopper and discharging door DMP mixer planetary, attrition rate of the clutch and normal algorithm of the water distribution system.

3. The pitch elongation condition should be checked for concrete mixer using chain drive.

hahei

Posts : 922
Join date : 2014-02-08

Back to top Go down

Back to top

- Similar topics

 
Permissions in this forum:
You cannot reply to topics in this forum