In the concrete production process of commercial concrete batching plant concrete mixer company portable cement mixers for sale, because it is on all day, how many degrees the temperature is normal of commercial concrete batching plant and how to test and manage the temperature scientifically of concrete batching plant are of importance for the concrete production, which will affect the process of whole project.
Henan Daswell Machinery is a professional manufacturer of construction machine for almost 30 years in China. We are dedicated to supplying our customers with best service and products, our major products include:concrete block making machine supplier,Sicoma twin shaft cement mixer,If you are interested in our products, please contact us freely: sales@daswell.com
concrete mixing plant
How to effectively control the temperature of concrete mixing plant?
1. The temperature of the construction environment detection. Test the construction environment of concrete mixing plant at 10 o'clock SICOMA Planetary Concrete Mixer, 14 o'clock and 18 o'clock three times.
2. Test the temperature of mixing materials and antifreezing agent, which is not less than 3 times every class.
3. Test the produced concrete of concrete mixing plant every 3 hours.
4. Test the temperature of placing and vibrating end at least every two hours.
Henan Daswell Machinery is a professional manufacturer of construction machine for almost 30 years in China. We are dedicated to supplying our customers with best service and products, our major products include:concrete block making machine supplier,Sicoma twin shaft cement mixer,If you are interested in our products, please contact us freely: sales@daswell.com
concrete mixing plant
How to effectively control the temperature of concrete mixing plant?
1. The temperature of the construction environment detection. Test the construction environment of concrete mixing plant at 10 o'clock SICOMA Planetary Concrete Mixer, 14 o'clock and 18 o'clock three times.
2. Test the temperature of mixing materials and antifreezing agent, which is not less than 3 times every class.
3. Test the produced concrete of concrete mixing plant every 3 hours.
4. Test the temperature of placing and vibrating end at least every two hours.
hahei- Posts : 922
Join date : 2014-02-08
Similar topics
» Flame Temperature Control of Concrete Mixing Plant
» Control the Lubricating Oil Temperature of Mixing Machine
» How to effectively protect the mixing drum of concrete mixing plant
» Strict quality control of concrete mixing plant
» Electrical Control System for Concret Mixing Plant
» Control the Lubricating Oil Temperature of Mixing Machine
» How to effectively protect the mixing drum of concrete mixing plant
» Strict quality control of concrete mixing plant
» Electrical Control System for Concret Mixing Plant
Page 1 of 1
Permissions in this forum:
You cannot reply to topics in this forum